Description and usage
The alternative current board for Tyness Ewattch measures at high frequency, the currents on each of its 3 inputs. It enables to measure the current consumed by a device with great precision. The data made available for each of the reading inputs are
Technical specifications
Allocation of the terminal blocks :
Implementation and wiring
The Tyness and the board must be disconnected. The board must be installed carefully and with precision of connectors on the locations EXT.1 and/or EXT.2 of the Tyness. In the case of the board fitted with connectors, the wires of the inputs must be
Card settings
The board is configured with the Tyness Configurator software. Always use the latest version of the Tyness Configurator and validate that your Tyness has the latest version of the firmware. If necessary, carry out an update. Click on “Config” of the board
Reading of RMS currents
It is possible to read with the Tyness Configurator software the values of the RMS current readings by the Tyness. To do so, position the mouse on the image of the board, and the readings will display. PayLoad Descriptions/strong> A Tyness transmits its data
Hazards and Warnings
Manufacturer is not responsible for user’s failure to comply with the instructions contained in this manual.Any service performed on this product must be completed by a qualified individual.Replacement of this product must be performed by a qualified individual.Failure to use
Description and usage
Référence : TYNESS-OPT-PT100 TYNESS-OPT-PT1000 TYNESS-OPT-PT100 and TYNESS-OPT-PT1000 boards are additional boards comprising 4 temperature measurement inputs using 3-wire probes. The board is intended to be set up on our TYNESS sensors (ENERGY and MODULAR). It comprises 4 terminal blocks of type AVX series 9276, 3
Technical specifications
Dimensions: 1 additional standard location for Tyness Connectors: 4 connectors type AVX série 9276, 3 terminals (2/10° à 8/10° – 24 à 18 AWG) ● resolution: 0.01°C ● accuracy: +-0.5°C ● measures: -100°C to +300°C Number of inputs: 4 PT100 or PT1000 inputs 3 wires Power supply: By the TYNESS Allocation of
Implementation
First and foremost, the Tyness and the board must be disconnected. The board must be inserted on the connectors on the locations EXT.1 and/or EXT.2 of the Tyness. The wires of the probes must be inserted into the terminal blocks. In the case
Settings
The board is configured with the Tyness Configurator software. Always use the latest version of the Tyness Configurator and check that your Tyness has the latest version of the firmware. If necessary, carry out an update. Configuration steps 1 – Click on “Config” of