Avant toute manipulation, le Tyness et la carte doivent être hors tension. La carte doit être installée sur les connecteurs des emplacements EXT.1 et/ou EXT.2 du Tyness. Les fils doivent être insérés dans les bornes. Nous vous recommandons l’utilisation de câbles de type

Manufacturer is not responsible for user’s failure to comply with the instructions contained in this manual.Any service performed on this product must be completed by a qualified individual.Replacement of this product must be performed by a qualified individual.Failure to use

TYNESS-OPT-PT100 and TYNESS-OPT-PT1000 boards are additional boards comprising 4 temperature measurement inputs using 3-wire probes. The board is intended to be set up on our TYNESS sensors (ENERGY and MODULAR). It comprises 4 terminal blocks of type AVX series 9276, 3 terminals. The

Dimensions: 1 additional standard location for Tyness Connectors: 4 connectors type AVX série 9276, 3 terminals (2/10° à 8/10° – 24 à 18 AWG) ● resolution: 0.01°C ● accuracy: +-0.5°C ● measures: -100°C to +300°C Number of inputs: 4 PT100 or PT1000 inputs 3 wires Power supply: By the TYNESS Allocation of

First and foremost, the Tyness and the board must be disconnected. The board must be inserted on the connectors on the locations EXT.1 and/or EXT.2 of the Tyness. The wires of the probes must be inserted into the terminal blocks. In the case

The board is configured with the Configurator software. Always use the latest version of the Configurator and check that your Tyness has the latest version of the firmware. If necessary, carry out an update. Configuration steps 1 – Click on “Config” of the